2022 Arrowhead 135
Arrowhead winter ultramarathon International Falls to Tower, MN.
INGLESIDE ENGINEERING & CONSTRUCTION
Arrowhead winter ultramarathon International Falls to Tower, MN.
Air developing with the boys on a new 96′ deep water well in Watertown, MN.
Operation of a deep water well enclosed single gear pump jack on Lake Sarah, MN. The enclosed gear provides continuous lubrication which works the oil from the case reservoir up over the various bearing surfaces and then returns to the reservoir.
50 km ultramarathon at the Riverdale Regional Park in Brighton Colorado. I checked off the state of Colorado (37) and set a p.r. with a time of 5:36 in the “Runs with scissors” 50k. 24 laps on 1.3 mile course. Big surprise as my left knee was immobile 4 days prior and was not sure…
DetailsColdwater 100 mile ultra marathon 1/16-1/17/21 in Estrella mountain range park Goodyear Arizona.
Great work, thanks guys! – Barry T. Thank you very much for your services, job well done, much appreciated -Terry Thanks for the quick repair! -Barb and Todd Thank you for the new water! You did a great quick job. You will be referred. -Tony & Tracy
DetailsDrilling a well using mud rotary in the twin cities metro area.
Cleaning a 170′ water well in Greenfield MN (Hennepin County), using compressed air.
Air development on a 200′ well in Buffalo, Minnesota (Wright County).
Well sealing with a knife perforator on 6″ well casing 317′ deep in Wayzata, MN. The perforator required 6677lbs of pull on 25 year old well casing. Bob L. says, “pull with a light hand and use a drillers knot on the sandline to keep it clean and prevent the perforator from getting stuck.” Protect…
Details